Nyckelfärdigt attefallshus

Turnkey cabin – exactly what it means

"Turnkey" is used in different ways by different companies. With us it means the house is fully built, with finishes, kitchen and toilet, when it is lifted onto the foundation. What remains is connecting electricity, water and drainage, which authorised installers do on site.

Updated

Finished timber house, 6 × 3 m, photographed at an angle from the front on its foundation
The 18 m² house seen at an angle from the front – just as it stands after delivery.
From approx. SEK 376,000incl. VAT, delivered by crane (≈ €33,750; €1 = SEK 11.131, ECB 2026-10-23)
House 6 × 3 m, 18 m², kitchen and toilet. Foundation and connections not included.

Who does what

Updated 2026-10-23
WorkUsYou or your installer
Build the complete house✔
Transport and crane lift✔
Foundation to the dimension sketch✔
Electrical connection from the main building or service✔ (registered electrical contractor)
Water and drainage to the house✔
Notification or building permit with the municipalityDrawings✔

Why not everything?

Connections and groundwork are local jobs that need local permits and local knowledge. We give you the drawings and technical details the installers need, so everything fits when the house arrives.

Read it step by step under how it works.